In order to make the website optimal and constantly improve it, our website uses cookies. By continuing to use the site, you consent to the use of cookies Privacy Policy
Accept

Process Specifications

The tool design is highly versatile, enabling adaptation to the specific requirements of each well. Engineers at KOMPLEKS LLC can swiftly create custom solutions tailored to clients' unique well designs.

Total exposed formation thickness per single RIH-ROOH:

Up to 40 m

Perforation area per linear meter of pipe:

200-240 cm2

Perforation time per meter:

40-60 minutes

Cavern formation depth:

0.5-1.5 meters (depending on formation geology)

от геологического строения пласта